我司制作了秘魯瓦伊克羅洛河綜合治理項目U型渠自行式模板臺車施工動畫。
秘魯瓦伊克羅洛河綜合治理項目位于秘魯秘魯中部利馬大區(qū)利馬省,距首都利馬約20km,本次施工的4標段,其中U型渠2.28KM。為加快U型渠施工進度,項目部采用了一款U型渠自行式模板臺車的新型設備。
相比傳統(tǒng)搭設支架安裝模板的方法,U型模板臺車具有一次安裝重復使用,移動靈活,配合設備少,減少施工人員數(shù)量,安拆模板快捷且安全性高的特點。
Our company produced the construction animation of U-channel self-propelled formwork trolley for the comprehensive treatment project of Vaikolo River in Peru.
Peru Vaikolo River comprehensive treatment project is located in Lima Province, Lima Region, central Peru, Peru, about 20km away from the capital Lima, the construction of 4 sections, of which U-shaped canal 2.28KM. In order to speed up the construction progress of U-shaped canal, the project department adopted a new equipment of U-shaped canal self-propelled formwork trolley.
Compared with the traditional method of installing stents, U-shaped formwork trolley has the characteristics of one-time installation and reuse, flexible movement, less equipment, less construction personnel, fast installation and removal of formwork and high safety.
公司QQ:251866187
聯(lián)系電話:15902788822
公司網(wǎng)站:cntwtech.com
聯(lián)系地址:武漢市武昌區(qū)武珞路628號亞貿(mào)廣場B座18樓
Company QQ:251866187
Contact number:15902788822
Company Website:cntwtech.com
Address: 18/F, Block B, Asian Trade Plaza, No. 628, Wuluo Road, Wuchang District, Wuhan